General Fire Fighting System
Msolution provides various installation and maintenance of
fire prevention, and is striving to develop fire prevention solutions.
General Fire Fighting System
The design and construction of firefighting facilities is an essential element to protect people
and property from fire, and is a major facility that can detect and extinguish fires quickly.
At a time when laws and regulations related to fire safety are becoming more stringent, the importance of firefighting facilities is increasing.
To this end, we are preparing for the future to become a global company by introducing excellent technology and recruiting talented people.
GENERAL FIRE
FIGHTING SYSTEM
Firefighting Facility Inspection
According to the Act on Fire Prevention, Installation, Maintenance and Management of Firefighting Facilities, firefighting objects must be regularly inspected by themselves or by firefighting facility managers, technicians and safety managers.
Operational Inspection
Comprehensive Inspection
Checking the normal operation by artificially manipulating firefighting facilities, etc.
Checking whether the structural standards of major components of each facility, including the operation inspection of facilities, comply with the fire safe standards
All firefighting objects (except for firefighting objects that only install fire extinguishing equipment, such as hazardous materials manufacturing facilities)
- Total floor area of 5,000㎡ with fire extinguishing equipment such as sprinkler equipment or water spray installed
- Public institutions equipped with indoor fire hydrants and automatic fire detection facilities with a total floor area of 1,000㎡ or more
- Firefighting facility manager
- Persons related to firefighting objects or fire safety manager
- Firefighting facility manager
- Firefighting facility manager or firefighting engineer appointed as fire safety manager
Using a waterproof pressure sensor, insulation resistance tester, heat/smoke dector tester
Using equipmet in accordance with the standards of the firefighting facility management business
1. Comprehensive Inspection : Conducted 6 months after the month of comprehensive inspection
2. Other subject : Once a year
* Multi-use facilities are conducted at least once every quarter
Implemented until the month in which the date of approval for use of the building belongs
(In the case of a new building, it is implemented from the year following the issuance of the firefighting facility completion inspection certificate)
Self-retention for 2 years
Submit to the local fire department within 30 days of inspection
Reference
·Firefighting Equipment Replacement
Korea Meteorological Administration
Cheongju
·Firefighting Construction
·Firefighting Construction
Cheongju Facilities Corporation
Cheongju
·Monthly Fire Management
·Operational Inspection
·Comprehensive Inspection
Cheongju National University Of Education
Cheongju
·Monthly Fire Management
·Operational Inspection
·Comprehensive Inspection
Cheongju Edinburgh Country Club
Ochang
·Comprehensive Inspection
37th Infantry Division
Goesan
·Operational Inspection
·Defect Repair
Army Cadet Military School
Goesan
SK telecom
Gyongnam, Gyeongbuk
·Comprehensive Inspection
·Operational Inspection
·Monthly Fire Management
·Operational Inspection
·Operational Inspection
·Comprehensive Inspection
5th Air Mobility Wing
Gimhae
·Comprehensive Inspection
·Monthly Fire Management
·Operational Inspection
Gamgye Eco Primium Apt.
Changwon
·Operational Inspection
·Comprehensive Inspection
·Comprehensive Inspection